Conveyor installation work steps: Scribing 2. Check the civil construction and check the anchor bolts and embedded steel plates; 3. Check the position of each part of the conveyor; 4. Install the truss according to the anchor bolts; 5. Installation and adjustment of equipment (including upper and lower rollers, wipers, drive devices, etc.); 6. Install the tape hoist; 7. Install the telescopic head; 8. Install the guide trough; 9. Install the tensioning device; 10. Install all electrical part brackets; 11. Tape cutting and vulcanization joints. Conveyor electrical part installation steps: 1. Install cable ducts; 2. Install limit switches, protection devices, electric control cabinets, etc.; 3. Install the electric light; 4. Laying the cable; 5. Connect the wires. At the end of the installation of the conveyor, the damaged part of the paint shall be repainted according to the technical specifications. Secondly, add grease or lubricating oil to the following conveyor equipment according to the procedures specified in the lubricant operation manual: reducer, coupling, crane, bearing housing, motor bearing, etc. Insert Pad, the super absorbent core layer adopts a combined absorption structure of polymer absorbent and fluff pulp. It
absorbs quickly and fully, effectively agglomerates without back
seepage, ensures anti-seepage and anti-leakage, allowing users to be dry
and dry at any time. Select Booster Pads,Total Dry Booster Pads,Diaper Inserts For Adults,Adult Diaper Booster Pads Shandong Kangshun Daily Products Co., Ltd , https://www.centurybenifit.com
Feel comfortable and natural. Curved
three-dimensional cutting, and considerate, at the same time using a
soft and dry non-woven surface layer, good air permeability. The user can be dry and clean in any posture.
With
leak-proof elastic trousers, the unique U-shaped design gently wraps
the legs to effectively prevent urine from leaking sideways, allowing
users to be dry and clean under any circumstances.
Conveyor installation steps>
In order to better use our products, our technical staff of Xinxiang Jinhe Machinery Co., Ltd. introduces the installation steps of the conveyor. Before installing the conveyor, it must be installed after the transfer tower and silo are completed. The installation and adjustment of the machine are carried out in accordance with geological parameters and drawings.
Next Article
Yogurt should not be heated
Prev Article
Winter pay attention to watering vegetables